TEst Logo
TEst Logo
  • Home
  • Train Problems
    • The 12 Big Train Problems
    • 1. Eroding Beach & Bluffs
    • 2. Costly Del Mar Tunnel
    • 3. $$$San Clemente Tunnel
    • 4. Low Ridership
    • 5. Low Freight Volume
    • 6. Beach Destruction
    • 7. Not Equitable
    • 8. Doesn't Reduce Traffic
    • 9. Doesn't Reduce GHGs
    • 10. No Military Necessity
    • 11. Large Tunnel Impact
    • 12. Blocks Coast Access
  • Rail-To-Trail Benefits
    • 6 Benefits: Rail-to-Trail
    • 1. More Biking & Walking
    • 2.+Community/Urban Design
    • 3. Saves Beaches & Access
    • 4. Improves Safety
    • 5. Major Economic Benefit
    • 6. Fed/CA Funds Available
    • Rails-to-Trails.Org
  • About
    • About
    • Join Us. Contact Us.
    • News
  • Vision
    • What's Your Vision?
    • Rendering: Before & After
  • More
    • Home
    • Train Problems
      • The 12 Big Train Problems
      • 1. Eroding Beach & Bluffs
      • 2. Costly Del Mar Tunnel
      • 3. $$$San Clemente Tunnel
      • 4. Low Ridership
      • 5. Low Freight Volume
      • 6. Beach Destruction
      • 7. Not Equitable
      • 8. Doesn't Reduce Traffic
      • 9. Doesn't Reduce GHGs
      • 10. No Military Necessity
      • 11. Large Tunnel Impact
      • 12. Blocks Coast Access
    • Rail-To-Trail Benefits
      • 6 Benefits: Rail-to-Trail
      • 1. More Biking & Walking
      • 2.+Community/Urban Design
      • 3. Saves Beaches & Access
      • 4. Improves Safety
      • 5. Major Economic Benefit
      • 6. Fed/CA Funds Available
      • Rails-to-Trails.Org
    • About
      • About
      • Join Us. Contact Us.
      • News
    • Vision
      • What's Your Vision?
      • Rendering: Before & After
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Train Problems
    • The 12 Big Train Problems
    • 1. Eroding Beach & Bluffs
    • 2. Costly Del Mar Tunnel
    • 3. $$$San Clemente Tunnel
    • 4. Low Ridership
    • 5. Low Freight Volume
    • 6. Beach Destruction
    • 7. Not Equitable
    • 8. Doesn't Reduce Traffic
    • 9. Doesn't Reduce GHGs
    • 10. No Military Necessity
    • 11. Large Tunnel Impact
    • 12. Blocks Coast Access
  • Rail-To-Trail Benefits
    • 6 Benefits: Rail-to-Trail
    • 1. More Biking & Walking
    • 2.+Community/Urban Design
    • 3. Saves Beaches & Access
    • 4. Improves Safety
    • 5. Major Economic Benefit
    • 6. Fed/CA Funds Available
    • Rails-to-Trails.Org
  • About
    • About
    • Join Us. Contact Us.
    • News
  • Vision
    • What's Your Vision?
    • Rendering: Before & After

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

benefit #4 IMRPOVES SAFETY

  1. Biking and E-Biking are becoming more popular and the conflicts between cyclists, cars & trucks and pedestrians is growing. A 61 mile coastal trail from downtown San Diego to San Clemente will dramatically improve safety for walkers and cyclists on the busy North-South coastal corridor. 

References

  1. https://www.forbes.com/sites/dianafurchtgott-roth/2022/09/08/bike-lanes-dont-make-cycling-safe/?sh=76ae02af4ca8
  2. https://www.amazon.com/Effective-Cycling-Press-John-Forester/dp/0262516942/
  3. https://digitalcommons.unl.edu/cgi/viewcontent.cgi?article=1061&context=arch_crp_theses
  4. https://www.transportation.gov/sites/dot.gov/files/docs/safer_people_safer_streets_summary_doc_acc_v1-11-9.pdf

NEXT Benefit: 4 Improves safety

Rail to Trail projets can create significant positive economic impacts. LEARN MORE



Copyright © 2023 The Surf Line Trail - All Rights Reserved.

  • About
  • News